Skip to content
🚚 Unlock Free Ground Shipping with $75+ Purchase

Cart

Your cart is empty

Build the complete floor

Epoxy Floor Systems

Create a solid-color, decorative flake or metallic epoxy floor for garages, basements, workshops and commercial interiors.

  • Interior concrete
  • Solid, flake or metallic
  • Standard or extended work time
  • Complete systems available

Choose your look

Start with the floor style you want

Skip to all products
Straightforward system

Solid Color

Clean, uniform finish

Use CR-531 with the selected Solid Color Epoxy Pigment, followed by the compatible topcoat.

Shop Solid Color

Decorative Flake

Color, texture and depth

Broadcast decorative flake into a pigmented epoxy base coat, then protect it with a compatible clear topcoat.

Shop Decorative Flake
High-design finish

Metallic Epoxy

Flowing, marbled effects

Use a pigmented base coat followed by Extended Work Time Epoxy with Liquid Nebula metallic pigment.

Shop Metallic Epoxy

Shop the system

Shop epoxy, pigments, flake and accessories

Choose the right epoxy

CR-531 or Extended Work Time?

CR-531

Standard Epoxy

Best for standard base coats, solid-color floors and flake systems when normal working time is appropriate.

EXTENDED WORK TIME

More placement time

Designed for metallic coats, warmer conditions or installers who need additional time to spread and manipulate the epoxy.

IMPORTANT

Pigment is not epoxy

Solid Color and Liquid Nebula pigments are colorants. They must be mixed into the compatible epoxy product and are not complete floor coatings by themselves.

Understand the layers

Build the complete epoxy floor

  1. 1

    Prepare

    Clean, profile and moisture-test the concrete according to the coating requirements.

  2. 2

    Prime or base

    Install the specified bond coat or pigmented epoxy base coat for the selected system.

  3. 3

    Decorate

    Add the correct solid pigment, decorative flake or Liquid Nebula metallic pigment.

  4. 4

    Topcoat

    Protect the decorative epoxy with the compatible clear urethane or polyaspartic topcoat.

  5. 5

    Cure

    Keep foot traffic, water, furniture and vehicles off the floor for the specified cure period.

Before you begin

Epoxy floor FAQs

Is epoxy pigment a complete floor coating?

No. Solid Color and Liquid Nebula metallic pigments are colorants that must be mixed into the specified epoxy. The pigment container alone will not coat a floor.

Which epoxy should I use for the base coat?

CR-531 Standard Epoxy is the preferred base coat for most solid-color, flake and metallic systems. Select the base-coat color to coordinate with the decorative finish being installed.

When should I use Extended Work Time Epoxy?

Use Extended Work Time Epoxy for metallic coats and when additional placement time is helpful, including warmer application conditions. Always follow its current temperature, film-thickness and cure requirements.

Do metallic floors need a separate base coat?

Yes. A metallic system normally uses a properly prepared, pigmented base coat followed by the extended-work-time metallic epoxy coat containing Liquid Nebula pigment.

Does epoxy need a clear topcoat?

A compatible urethane or polyaspartic clear topcoat is recommended where the system calls for added abrasion, chemical and wear protection. Match the topcoat to the epoxy system and intended use.

Can epoxy be installed over painted or sealed concrete?

Do not apply directly over an unknown or poorly bonded coating. Existing paint, sealer, adhesive, curing compound and contamination must be evaluated and removed or prepared as required before coating.

How should concrete be prepared for epoxy?

The concrete must be clean, sound, dry, properly profiled and evaluated for moisture. Preparation requirements depend on the slab and coating system, so follow the current technical data sheets.

When can people or vehicles return to the floor?

Return-to-service time depends on the epoxy, topcoat, temperature, humidity and installed thickness. Follow the longest applicable cure time in the complete system before allowing foot or vehicle traffic.